Aviso de Subasta

AIR TRAFFIC CONTROL TOWER (ATCT) REHABILITATION, RAFAEL HERNANDEZ INTERNATIONAL AIRPORT (BQN),
AGUADILLA, PUERTO RICO​



Subasta Número: 1-34
Estatus: Abierta

Información General
Agencia: Autoridad de los Puertos (AP)
Tipo Subasta:
Formal
Localización del Proyecto:
Aguadilla
Fecha Reunión Pre-Subasta:
martes, 18 de julio de 2023
Hora: 10:00 a. m.

Lugar Pre-Subasta:
A non-compulsory pre-bid meeting will be held at Rafael Hernandez Airport, Aguadilla, PR, on July 18, 2023, at 10:00 AM (Local PR Time - AST).  PRPA strongly encourages prospective bidders to attend the pre-bid conference.  The above-mentioned pre-bid meeting will be held at the Conference Room, BQN Airport Manager's Office, located at the Second Floor of the Main Terminal Building.​

Fecha Entrega Pliegos:
Desde: viernes, 4 de agosto de 2023
Hora: 10:00 a. m.


Hasta: viernes, 28 de julio de 2023
Hora: 4:00 p. m.
Fecha Apertura:
jueves, 10 de agosto de 2023
Hora: 10:30 a. m.

Costo Pliegos:
$0.00
Descripción:

​The proposed project consists of the rehabilitation of the Air Traffic Control Tower (ATCT) and related facilities and equipment of the Rafael Hernández International Airport (BQN), Aguadilla, Puerto Rico.  This new proposed project area comprises the existing Air Traffic Control Tower building and the adjacent parking lot for staging of equipment (approximate area 3,100 sqm).
PRPA wants to ensure airport safety by improving the visibility of air traffic controllers.  Similarly, the scope of work includes reconstruction of the bases of the cabin structure, the related service systems (electricity, communications and fire protection) and the supports of the glass panels that have deteriorated significantly and require constant maintenance to prevent rainwater intrusion.  Catwalk railing rehabilitation also falls under this scope. All works shall be in accordance with plans, contract documents and technical specifications.​

ING. ROMEL PEDRAZA CLAUDIO
DIRECTOR EJECUTIVO AUXILIAR EN PLANIFICACION, INGENIERIA Y CONSTRUCION

Notas Especiales


  ​Bidders of this project shall submit the Proposal, in accordance with the Instructions to Bidders contained in the Contract Documents, on or before August 10, 2023, at 10:00 AM.   
A non-compulsory pre-bid meeting will be held at Rafael Hernandez Airport, Aguadilla, PR, on July 18, 2023, at 10:00 AM (Local PR Time - AST).  PRPA strongly encourages prospective bidders to attend the pre-bid conference.  The above-mentioned pre-bid meeting will be held at the Conference Room, BQN Airport Manager's Office, located at the Second Floor of the Main Terminal Building.
In order to participate, bidders should request bidding documents and drawings, by filling and submitting copy of the bidder's registration form, included as part of this advertisement, to the following email, Rrivera@prpa.pr.gov, until July 28, 2023, 4:00pm.
Bidders are advised that they must be registered as possessors of the contract documents for the project and possessors of all such amendments.
Date limit for Requests for Further Information (RFI) is July 28, 2023, 4:00 PM.  RFI should be addressed by email to the following address: Rrivera@prpa.pr.gov.
The Bid Opening will take place virtually on August 10, 2023, at 10:30AM through Microsoft Teams Application.  All bids received will be publicly opened and read aloud by the Bids Board.​
ADDENDUM NO. 1
TO ALL BIDDERS:
This addendum forms part of the Project Manual for Bid No. 1-34.  Acknowledge receipt of this addendum in the space provided on the bid proposal form.  Failure to do so may subject Bidder to disqualification.
 
GENERALEnclosed please find a copy of the Attendance List of the Pre-Bid Meeting and Site Visit, held on July 18, 2023 (10:00 am).Enclosed please find a copy of the PowerPoint Presentation of the Pre-Bid Meeting. TECHNICAL SPECIFICATIONSITEM C-105 MOBILIZATION has been added to Technical Specifications.ITEM SP-001 FIELD OFFICES has been added to Technical Specifications. BIDDING DOCUMENTSProposal Form has been revised. Please replace the previous Proposal Form with the new Proposal Form enclosed in this addendum.   
END OF ADDENDUM NO. 1
July 21, 2023
San Juan, Puerto Rico
 
 
 
 
 
Romel Pedraza, PE
Assistant Executive Director for
Planning, Engineering and Construction
 
ITEM SP-001 FIELD OFFICES
 
SP-001-1.1 Furnish, install, and maintain temporarily a suitable and waterproof field office for use of PRPA and Resident Engineer during entire construction period. Field offices for the use of PRPA and Resident Engineer shall be identified with signs and logos. Furnish, install, and maintain storage and works sheds needed for construction. Prior to installation of offices and sheds, coordinate location, access, and related facilities with PRPA Architect/Engineer. At completion of work, remove field offices, sheds, and their contents.
SP-001-1.2 Construction:
Provide facilities that are structurally sound, watertight in a like-new condition and with floor raised above ground.Temperature Transmission Resistance: Provide insulation compatible with occupancy and storage requirements.At Contractor's option, use portable of mobile buildings.Lighting: 50 foot-candles at desk top height.Exterior lighting at entrance door.Size 30'x12'Office Trailer with one 1) private office and a conference area.Exterior lighting at entrance door.Air conditioning.Minimum of four (4) 110-volt, duplex electric convenience outlets, at least one on each wall.Electric distribution panel: Two circuits minimum, 110-volt, 60 hertz service.Anchoring System for Mobile or Portable Buildings: Sufficient to withstand hurricane force winds and meeting code.Meeting Area Furnishings:Conference table and chairs for at least eight (8) persons.Racks and files for Project Records Documents in, or adjacent to the meeting area.Other Furnishing: Contractor's options.Health Service: Water and sanitary facilities.Janitor Service: DailyInternet Connection: Provide and install a DSL internet wireless service account for the period of the project.Computer equipment: Provide the following equipment including installation of software and set up (at the completion of the project, the equipment listed will be returned to the Contractor):1 ea. Laptop Computer (recent technology), DVD/CD Rewritable, with following software installed: MS Windows (latest version), MS Office Professional (latest version) and Adobe Acrobat Professional (latest version), MS Project (latest version).1 ea. Photo Quality Color Inkjet Printer (printer, copier, fax & scanner).1 ea. Digital Camera (10 Mega pixels minimum) with 2 GB internal memory (minimum).Provide paper (bond and photo quality) products, 100 DVD package and printer inks as required.Other Equipment:2 ea. Computer Desk.2 ea. Desks 30"x 60".3 ea. Chairs, swivel-desk.2 ea. Chairs straight-arm (visitor's chairs).1 ea. Conference table and chairs for at least eight (8) persons.1 ea. Lateral filing cabinets, 4 drawers, legal size.2 ea. Filing trays, desk type, 5 tier, legal size.2 ea. Waste baskets1 ea. Pencil sharpener, electric1 ea. Rack, wall, plan, 12 plan capacity.1 ea. Refrigerator1 ea. Water cooler, electric1 ea. Clock, electric1 ea. Coffee maker/dispenser, with cups1 ea. Microwave ovenAs required: lamps, desk, shelves, windows shades, and bathroom supplies.Storage Sheds:To meet requirements of various trades.Dimensions: Adequate for storage and handling of products.Ventilation: Comply with specified and code requirements for products stored. 
PRODUCTS
SP-001-2.1 Construction: Materials, Equipment, Furnishings: New or used, serviceable, adequate for required purpose, and that do not violate applicable codes or regulations.
 
EXECUTION
SP-001-3.1 Installation
Fill and grade sites for temporary structures as necessary to provide surface drainage.Construct temporary field offices and storage sheds on proper foundations, provide connections for utilities services.Secure portable or mobile buildings, when used, against break-ins and hurricane force winds per code. Provide steps and landings at entrance doors.SP-001-3.2 Maintenance and Cleaning
Provide periodic maintenance and cleaning for temporary structures, furnishings, equipment, and services.SP-001-3.3 Removal
Remove temporary field offices, contents and services when no longer needed.Remove storage sheds when no longer needed.Remove foundations and debris, grade site to specified elevations and complete remaining site work indicated on Drawings. 
BASIS OF PAYMENT
SP-001-4.1. Payment shall be made based on the contract lump sum price for “Field Office" and partial payments will be allowed on the next pay estimate based on the estimated completion of the Project as follows below. This price shall be full compensation for furnishing all materials and for all labor, equipment, tools, and incidentals necessary to complete the item.
follows:
With the first pay request, 25%.When 25% or more of the original contract is earned, an additional 25%.When 50% or more of the original contract is earned, an additional 40%.After Final Inspection, staging area clean-up and delivery of all Project Closeout materials as required by 90-11, the final 10%. 
END OF ITEM SP-001
 
ITEM C-105 MOBILIZATION
 
105-1 Description. This item of work shall consist of, but is not limited to, work and operations necessary for the movement of personnel, equipment, material and supplies to and from the project site for work on the project except as provided in the contract as separate pay items.
105-2 Mobilization limit. Mobilization shall be limited to ten (10) percent of the total project cost.
105-3 Posted notices. Prior to commencement of construction activities, the Contractor must post the following documents in a prominent and accessible place where they may be easily viewed by all employees of the prime Contractor and by all employees of subcontractors engaged by the prime Contractor: Equal Employment Opportunity (EEO) Poster “Equal Employment Opportunity is the Law" in accordance with the Office of Federal Contract Compliance Programs Executive Order 11246, as amended; Davis Bacon Wage Poster (WH 1321) - DOL “Notice to All Employees" Poster; and Applicable Davis-Bacon Wage Rate Determination. These notices must remain posted until final acceptance of the work by the Owner.
105-4 Engineer/RPR field office. The Contractor shall provide dedicated space for the use of the field RPR and inspectors, as a field office for the duration of the project. This space shall be located conveniently near the construction and shall be separate from any space used by the Contractor. The Contractor shall furnish water, sanitary facilities, heat, air conditioning, and electricity in accordance with local building codes. An Engineer/RPR field office is not required.
 
METHOD OF MEASUREMENT
105-5 Basis of measurement and payment. Based upon the contract lump sum price for “Mobilization" partial payments will be allowed as follows:
With the first pay request, 25%.When 25% or more of the original contract is earned, an additional 25%.When 50% or more of the original contract is earned, an additional 40%.After Final Inspection, staging area clean-up and delivery of all Project Closeout materials as required by Section 90, paragraph 90-11, Contractor Final Project Documentation, the final 10%. 
BASIS OF PAYMENT
105-6 Payment will be made under:
Item C-105 Mobilization
 
REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
Office of Federal Contract Compliance Programs (OFCCP)
Executive Order 11246, as amended.
EEOC-P/E-1 – Equal Employment Opportunity is the Law Poster
United States Department of Labor, Wage and Hour Division (WHD)
WH 1321 – Employee Rights under the Davis-Bacon Act Poster
 
 
END OF ITEM C-105
 
GOVERNMENT OF PUERTO RICO
PUERTO RICO PORTS AUTHORITY
 
AIR TRAFFIC CONTROL TOWER (ATCT) REHABILITATION
RAFAEL HERNANDEZ INTERNATIONAL AIRPORT
AGUADILLA, PUERTO RICO
BID NO. 1-34
 
PROPOSAL
 
_______________________2023
 
Executive Director
Puerto Rico Ports Authority
PO Box 362829
San Juan, Puerto Rico 00936-2829
 
The undersigned (hereinafter called "Bidder") in compliance with your invitation for bids of the construction project, Terminal Expansion & Alterations, Rafael Hernandez International Airport, Aguadilla Puerto Rico, having examined the plans, specifications and related documents, the site of the proposed work, and being familiar with all the conditions surrounding the construction of the proposed project, including the availability of materials and labor, hereby proposes to furnish all labor, materials, equipment and supplies, and to construct the project in accordance with the Contract Documents, within the time set forth, and for the following lump sum prices:
 
BASE BID 
Item No.Qty.UnitDescriptionTotal CostA.1LSMobilization: Field Office/Insurance/Bonds & Administrative Cost:
(Shall not exceed 10% of total)
________________________________________
________________________________________
(Price in Words)
$____________B.1LSMunicipal Taxes in accordance with Aguadilla rate:
________________________________________
________________________________________
(Price in Words)
$____________11LSDeconstruct and reconstruct the air traffic control cab windows. Remove existing steel frame and glass panels, and Furnish & Install new stainless-steel frame and reinstall existing glass panels at control cab glass windows: Perform the work in accordance with Scope-of-Work description, Specification Sections 055000, Metal Fabrication; 079200, Joint Sealants; and 099600, High-Performance  Coatings, and repair details drawings SK.1 through SK.4 & SK.7, and original drawings for the  ATCT rehabilitation project, including all labor, materials, hoisting equipment,  and ancillary items as required to complete the work   for the contract Lump Sum Price of:
________________________________________
________________________________________
(Price in Words)
$____________21LSFurnish & install new motorized double window shades on all glass panels. Perform the work in accordance with Scope-of-Work description, Specification Section 122413, Transparent Motorized Plastic ATCT Window Roller Shades, and original project drawings A2.4, A6.7, and A6.8, including all labor, materials, power connection, and ancillary items as required to complete the work   for the contract Lump Sum Price of:
________________________________________
________________________________________
(Price in Words)
$____________31LSReplace existing modular tile carpet at air traffic control cab and Furnish & Install new ESD modular carpet tile.  Perform the work in accordance with Scope-of-Work description, specification section 096813, Tile Carpeting, and original project's drawings A1.5, A4.7, A5.0, A5.1, and A7.26, including all labor, materials, hoisting equipment, and ancillary items as required to complete the work   for the contract Lump Sum Price of:
________________________________________
________________________________________
(Price in Words)
$____________41LSReplace existing three (3) task chairs for ATC operation in the control cab. Perform the work in accordance with Scope-of-Work description, and original project's drawings A1.7 and A5.1, including all labor, materials, hoisting equipment, and ancillary items as required to complete the work   for the contract Lump Sum Price of:
________________________________________
________________________________________
(Price in Words)
$____________51LSReplace existing two (2) high back chairs for ATC supervision in the control cab. Perform the work in accordance with Scope-of-Work description, and original project's drawings A1.7 and A5.1, including all labor, materials, hoisting equipment, and ancillary items as required to complete the work   for the contract Lump Sum Price of:
________________________________________
________________________________________
(Price in Words)
$____________61LSFurnish three (3) 1,500 VA portable Uninterrupted Power Supply (UPS) backup units for ATC equipment at the control cab.  Perform the work in accordance with Scope-of-Work description, and original drawing A5.0, including all labor, materials, and ancillary items as required to complete the work   for the contract Lump Sum Price of:
________________________________________
________________________________________
(Price in Words)
$____________71LSReplace the existing uninterrupted power supply (PS) back-up system for the ATCT communication equipment at the equipment room (ATCT level +56'-7"),  Perform the work in accordance with Scope-of-Work description, and original project's drawings A1.4, and E1.4, E3.1, E3.2,  including all labor, materials,  and ancillary items as required to complete the work   for the contract Lump Sum Price of:
________________________________________
________________________________________
(Price in Words)
$____________81LSFurnish and install a standalone access control system to FAA controlled facilities including the main gate at ground level fenced site, the entrance door to the ATCT elevator lobby, the door to access the ATCT stairs and to the communications equipment room at bridge level, entrance door to the Air Traffic Control Cab, and door from the control cab to the catwalk.  Perform the work in accordance with Scope-of-Work description, and original project's drawings SI-1.0, SI-3.0, A-1.1, A1.4, A1.5, including all labor, materials, and ancillary items as required to complete the work   for the contract Lump Sum Price of:
________________________________________
________________________________________
(Price in Words)
$____________91LSReconnect at grade level all interrupted grounding wires for the lightning protection system of the ATCT and furnish a concrete encasement to protect the wires from being damaged by lawn mowers during maintenance services. Perform the work in accordance with Scope-of-Work description, and original project's drawings E4.1, E4.2, E4.3, and repair detail drawing SK.8, including all labor, materials, equipment, and ancillary items as required to complete the work   for the contract Lump Sum Price of:
________________________________________
________________________________________
(Price in Words)
$____________101LSReplace, furnish & install new FAA minimum requirement equipment list for ATCT operation.  Perform the work in accordance with Scope-of-Work description, Specification Section 17 00 00 Specifications for Air Traffic Control (ATC) Equipment and original project's drawings A1.7 and A5.0, including all labor, materials, equipment, and ancillary items as required to complete the work   for the contract Lump Sum Price of:
________________________________________
________________________________________
(Price in Words)
$____________111LSReplace, furnish & install electronic and meteorological instrumentation and equipment in the new location as shown on attached drawings.  Perform the work in accordance with Scope-of-Work description, specification 17 00 00 Specifications for Air Traffic Control (ATC) Equipment, and original project's drawings 2 of 28 Airport Layout Plan (PRAP drawing 2/17/2006), including all labor, materials, equipment, and ancillary items as required to complete the work   for the contract Lump Sum Price of:
________________________________________
________________________________________
(Price in Words)
$____________121LSReplace, furnish & install secondary meteorological instrumentation & equipment on the ATCT roof. Perform the work in accordance with Scope-of-Work description, Specification Section 17 00 00 - Specifications for Air Traffic Control (ATC) Equipment and original project's drawings A3.4, A4.7, A5.0, A6.7, A6.8, A7.3, A7.8, A7.14, and A7.15.   including all labor, materials, equipment, and ancillary items as required to complete the work   for the contract Lump Sum Price of:
________________________________________
________________________________________
(Price in Words)
$____________131LSReplace existing corroded steel guardrail with new stainless-steel guardrail at control cab catwalk level.  Perform the work in accordance with Scope-of-Work description, Specification Sections 024119 - Selective Demolition, 055000 - Metal Fabrications, and 055213 - Pipe Tubing Railings, and original project's drawings and original project's drawings A3.1, A3.2, A7.23, A7.24, and repair detail drawing SK.7 and SK.8, including all labor, materials, equipment, and ancillary items as required to complete the work   for the contract Lump Sum Price of:
________________________________________
________________________________________
(Price in Words)
$____________141LSReplace existing corroded steel guardrail with new stainless-steel guardrail at control cab roof level.  Perform the work in accordance with Scope-of-Work description, Specification Sections 024119 - Selective Demolition, 055000 - Metal Fabrications, and 055213 - Pipe Tubing Railings, and original project's drawings A7.3, A7.23, A7.24, and repair detail drawing SK.5, including all labor, materials, equipment, and ancillary items as required to complete the work   for the contract Lump Sum Price of:
________________________________________
________________________________________
(Price in Words)
$____________151LSRepair and refinish corroded steel supporting structure for the rotating beacon at control cab's roof.  Perform the work in accordance with Scope-of-Work description, Specification Sections 055000 - Metal Fabrications, 099600 - High Performance Coatings and drawings A7.3, A7.13, A.14, A.15, and repair detail drawing SK.6, including all labor, materials, equipment, and ancillary items as required to complete the work   for the contract Lump Sum Price of:
________________________________________
________________________________________
(Price in Words)
$____________161LSRepair and refinish corroded steel supporting structure for the antenna raceway structure at control cab's roof.  Perform the work in accordance with Scope-of-Work description, Specification Sections 055000, Metal Fabrications, 09 96 00 High Performance Coatings, and original project's drawings A7.8, A7.9, A7.14, and A7.15, and repair detail drawing SK.6, including all labor, materials, equipment, and ancillary items as required to complete the work   for the Lump Sum Price of:
________________________________________
________________________________________
(Price in Words)
$____________171LSDemolish existing roof waterproofing membrane, insulation system, and roofing accessories, flashing and trims. And Furnish & Install a new roof insulation system, waterproofing single ply membrane, including associated flashing, trims, and other roofing specialties.  Perform the work in accordance with Scope-of-Work description, Specification Sections 061000, Rough Carpentry; 070150.19 Preparation for Reroofing, 072000 Roof Boards, 072100 Thermal Insulation 075419 Polyvinyl-Chloride (PVC) Roofing, 076200 Sheet Metal Flashing and Trim, 079200 Joint Sealants, and original project's drawings A7.3, A7.4, A7.5A7.6, A7.7, and A7.8, including all labor, materials, equipment,  and ancillary items as required to complete the work   for the Lump Sum Price of:
________________________________________
________________________________________
(Price in Words)
$____________181LSReplace, furnish, and install a new runway lighting control panel at the control cab. The new runway lighting control panel must be compatible with the light's controllers in the existing runway lighting control room, on the first level.  Perform the work in accordance with Scope-of-Work description, including all labor, materials, equipment, and ancillary items as required to complete the work   for the Lump Sum Price of:
________________________________________
________________________________________
(Price in Words)
$____________191LSReplace the existing photocell sensor installed at the ATCT roof level controlling the luminaries at bridge level (ATCT level +56'-7"), located in the corridor between the elevator and the ATCT.  Perform the work in accordance with Scope-of-Work description, and original project's electric drawings, including all labor, materials, equipment, and ancillary items as required to complete the work   for the contract Lump Sum Price of:
________________________________________
________________________________________
(Price in Words)
$____________201LSReplace the one (1) microwave oven in the Controller's break room.  Perform the work in accordance with Scope-of-Work description, and drawings A4.2, including all labor, materials, equipment, and ancillary items as required to complete the work   for the contract Lump Sum Price of:
________________________________________
________________________________________
(Price in Words)
$____________211LSReplace, furnish, and install new exhaust fan in the bathroom in the ATCT fourth and sixth-floor level.  Perform the work in accordance with Scope-of-Work description, original project's drawings M3.0, M4.0, and M 9.0, including all labor, materials, equipment, and ancillary items as required to complete the work   for the contract Lump Sum Price of:
________________________________________
________________________________________
(Price in Words)
$____________221LSFurnish and install three (3) new 5-galon water cooler / dispensers, one (1) at the training / conference room on the third floor, one (1) at the employees break room on the sixth-floor level, and one (1) at the control cab level in the ATCT. Perform the work in accordance with Scope-of-Work description, and original project drawings A4.0, A4.2, and A5.1, including all labor, materials, equipment, and ancillary items as required to complete the work   for the contract Lump Sum Price of:
________________________________________
________________________________________
(Price in Words)
$____________231LSReplace, furnish, and install two (2) new water heaters in the existing bathrooms on the 4th and 6th floor levels. Perform the work in accordance with Scope-of-Work description, and original project's drawing P9.0, including all labor, materials, equipment, and ancillary items as required to complete the work   for the contract Lump Sum Price of:
________________________________________
________________________________________
(Price in Words)
$____________241LSReplace, furnish, and install (1) new 4.3 C.F. under the counter fridge in the control cab break room on the 6th floor level.  Perform the work in accordance with Scop e-of-Work description, and original drawings A4.0 and A4.2, including all labor, materials, equipment, and ancillary items as required to complete the work   for the contract Lump Sum Price of:
________________________________________
________________________________________
(Price in Words)
$____________251LSReplace, furnish, and install (1) new 21.0 CF top-freezer refrigerator in the controller's break room on the 6th floor level.  Perform the work in accordance with Scope-of-Work description, and location shown on original project drawing A4.2, including all labor, materials, equipment, and ancillary items as required to complete the work   for the contract Lump Sum Price of:
________________________________________
________________________________________
(Price in Words)
$____________261LSRepair cracks, blistering, efflorescence, flaking, peeling on all exterior cement plaster surfaces, and paint. Perform the work in accordance with Scope-of-Work description, Specification Section 09 91 13 Exterior Painting, and original project drawings A3.1 and A.3.2, including all labor, materials, equipment, and ancillary items as required to complete the work   for the contract Lump Sum Price of:
________________________________________
________________________________________
(Price in Words)
$____________271LSWaterproof / Caulk and seal around the exterior and interior side of all windows at the ATCT.  Perform the work in accordance with Scope-of-Work description, Specification Section 079200 – Joint Sealants, and original project's drawings A3.1, A3.2, A3.3, A.3.4, A3.5, and A3.6. including all labor, materials, equipment, and ancillary items as required to complete the work   for the contract Lump Sum Price of:
________________________________________
________________________________________
(Price in Words)
$____________281LSCorrect water infiltration through walls getting into the elevator's electric closet on the first floor, at the elevator's lobby.  Repair damaged surfaces and seal the envelope where identified the water entrance point. Perform the work in accordance with Scope-of-Work description, and original project's drawings A1.1, A4.8, and E1.1, and specifications sections 071900 - Water Repellents, 079200 - Joint Sealants, 099113 - Exterior Painting, and 099123 - Interior Painting, including all labor, materials, equipment, and ancillary items as required to complete the work   for the contract Lump Sum Price of:
________________________________________
________________________________________
(Price in Words)
$____________ 
TOTAL BASE BID  .………………………………………………….……
(Shall include the SUM of all partial pricing from item A, B and item No. 1 to item No. 28, inclusive.)
 
Write TOTAL BASE BID amount in words:
__________________________________________________________
__________________________________________________________
(In case of discrepancy the amount shown in words shall govern.)
$____________ 
It is understood that the above total price is for the entire work as required by the Drawings and Technical Specifications, that the price include all labor, equipment, materials, taxes, bailing, incidental work, overhead, profit, insurance, etc. to cover the finished work of the several kinds called for under the Contract, of which this Proposal is part. If a portion of the work shown in the drawings does not have specific line item, include the costs in the most related item. 
 
The Contractor (Bidder) irrevocably accepts that the contract cost in the base Proposal includes any and all overhead cost (job site, project fixed overhead, field office and extended main office overhead) and any profit that the Contractor may incur for up to sixty (60) calendar days of delays caused by any act of the Owner. The Contractor waives any type of claim for the overhead incurred during that period.
 
Bidder hereby agrees to commence works under this contract on a date to be specified in written "Notice to Proceed" of PRPA and to fully complete all works within five hundred forty (540) consecutive calendar days after written "Notice to Proceed" of the Puerto Rico Ports Authority.
 
Time for substantial completion shall be five hundred (500) consecutive calendar days, subject to any extension of time that may be granted, in accordance with Article 9.1.4 of the Uniform General Conditions.  Date of substantial completion will be certificated by the Owner, when in the opinion of the Owner all Work is completed.  Merely the eventual use or partial utilization of the areas by the Owner does not constitute substantial completion. Substantial completion will occur when the Owner's representative has certified that all components of the works including mechanical, electrical, plumbing, fire suppression, security and data systems are fully functional, and have been tested and accepted.
 
Bidder further agrees to pay as liquidated damages for the amount established in section 9.5 of the Uniform General Conditions base on the Bid Price for each calendar day that the project construction, included in the combination accepted by the owner, remains uncompleted after the time frame from the date of the order to proceed with the construction for each calendar thereafter as hereinafter provided in Section 9.4.1 of the Uniform General Conditions.
 
The cost bellow will be the project fixed overhead or field office cost to be reimbursed to the Contractor by the Owner due to   time extensions, delays, or interruptions to the work caused by any act of the Owner in excess of thirty (30) calendar days, as per Uniform General Condition 9.3 Delays and Extension of Time.
 
 
ItemDescriptionUnitsUnit Price 1a**FIELD OFFICE / MAIN OFFICE
EXTENDED OVERHEAD CAUSED BY DELAYS AND EXTENSION OF TIME BY THE OWNER
As per Uniform General Condition 9.3 Delays and Extension of Time.
Per Day 
 
$ ____________________
 
(Write Price in Words)
 
 
 
 
 
 
**Under no circumstance will the amount of Adjustment for Extended Overhead caused by delays and extension of time by the Owner will exceed the amount of liquidated damages as per section 9.5 of the Uniform General Conditions, Damages and amount calculated per Eichleay formula in accordance to Uniform General Condition 15.1.1.1.7.
 
The Bidder agrees that this bid shall be valid and may not be withdrawn for a period of one hundred eighty (180) calendar days after the scheduled closing time for receiving bids. Upon receipt of written notice of the acceptance of this bid, the Bidder will execute the formal contract included in the Contract Documents within ten (10) working days and deliver the required insurance and bonds specified in the General Conditions.
 
The Bidder acknowledges receipt of the following addenda:
 
Addendum No. ___________________________     dated __________________
Addendum No. ___________________________     dated __________________
Addendum No. ___________________________     dated __________________
Addendum No. ___________________________     dated __________________
Addendum No. ___________________________     dated __________________
Addendum No. ___________________________     dated __________________
Addendum No. ___________________________     dated __________________
Addendum No. ___________________________     dated __________________
 
The Bidder understands that the Puerto Rico Ports Authority reserves the right to reject any or all bids and to waive any informalities in the bidding process.
 
EQUAL OPPORTUNITY REPORT STATEMENT
 
(Complete the following statement by checking the appropriate boxes.  Failure to complete these blanks may be grounds for rejection of bid):
 
            1.         The Bidder has /    / has not /    / developed and has on file at each establishment affirmative action programs pursuant to 41 CFR 60-1.40 and 41 CFR 60-2.
 
            2.         The Bidder has /    / has not /    / participated in any previous contract or subcontract subject to the equal opportunity clause prescribed by Executive Order 11246, as amended.
 
            3.         The Bidder has /    / has not /    / filed with the Joint Reporting Committee the annual compliance report on Standard Form 100 (EE-1 Report).
 
            4.         The Bidder does /    / does not /    / employ fifty (50) or more employees.
CERTIFICATION OF NONSEGREGATED FACILITIES
 
By the submission of this bid, the Bidder, offer or, applicant, or subcontractor certifies that he does not maintain or provide for his employees any segregated facilities at any of his establishments and that he does not permit his employees to perform their services at any location, under his control, where segregated facilities are maintained.  He certifies further that he will not maintain or provide for his employees any segregated facilities at any of his establishments and that he will not permit his employees to perform their services at any location under his control, where segregated facilities are maintained.
 
The Bidder, offer or, applicant, or subcontractor agrees that a breach of this certification is a violation of the Equal Opportunity clause in this contract.  As used in this certification the term "segregated facilities" means any waiting rooms, work areas, rest rooms and wash rooms, restaurants and other eating areas, time clocks, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees which are segregated by explicit directive or are in fact segregated on the basis of race, color, religion, or national origin, because of habit, local custom, or otherwise.  He further agrees that (except where he has obtained identical certifications from proposed subcontractors for specific time periods) he will obtain identical certifications from proposed subcontractors prior to the award of subcontracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity clause; that he will retain such certifications in his files and that he will forward the following notice to such proposed subcontractors (except where the proposed subcontractors have submitted identical certifications for specified time periods):
 
NOTICE TO PROSPECTIVE SUBCONTRACTORS OF REQUIREMENT
FOR CERTIFICATIONS OF NONSEGREGATED FACILITIES
 
A certification of Non-segregated Facilities must be submitted prior to the award of a subcontract exceeding $10,000.00 which is not exempt from the provisions of the Equal Opportunity clause.
 
The certifications may be submitted either for each subcontract or for all subcontractors during a period (i.e., quarterly, semiannually, or annually).
 
NOTE: The penalty for making false statements in offers is prescribed in 18 U.S.C. 1001.
 
The bid bond (five percent (5%) of the bid amount) will become property of the Puerto Rico Ports Authority in the event that the contract and bonds are not executed within the time set forth.

 
 
 
Respectfully submitted:​   ​  Name of Bidder
*(Corporation, Partnership, or Individual)
 
 
By:
​  ​​​ ​​​Address ​  Name of Authorized Officer​ Signature of Authorized Officer ​  Tel. No.:   Cell No.:    ​  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 ​ *(Seal – if bid is by a corporation) 
ADDENDUM NO. 2
 
 
TO ALL BIDDERS:
This addendum forms part of the Project Manual for Bid No. 1-34.  Acknowledge receipt of this addendum in the space provided on the bid proposal form.  Failure to do so may subject Bidder to disqualification.
 
GENERAL Enclosed please find the corresponding evaluations and responses to the RFI No. 1 received last Friday, July 28, 2023, for questions No. 4 to 15.Revised Frame Installation Diagram based on schematic SK.3, which was updated for this Addendum, and included below.New Pre-fabricated Window Detail schematic, identified as NEW diagram SK.9 and included below. Answers to Questions No.1 to No.3 of RFI No.1 (received July 28,2023) will be answered on a separate Addendum.  END OF ADDENDUM NO. 2
Below, we include our evaluation and responses to the RFI No. 1 received last Friday, July 28, 2023.
 
Question No. 4:           Please provide the following information: Provide dimensions for the angle and support detailing (bolts diameter, spacing and specification, etc.).
Response:                  For the purposes of this bid, Bidders must consider the new prefabricated 316 stainless steel angle 4 ½" by 3 ¼" for window frame installation as shown in the attached detail SK-9. The new stainless-steel angle is formed with two plates. One side of the angle is 4 ½" by ¾", and the second side is 3 ¼" by ½".
Question No. 5:           In section SK3, is the stiffener plate new, does the existing one remain?
Response:                  For the purposes of this bid, Bidders must consider the stiffener plates and the closure plates shown in drawing SK-3 to be existing to remain. See revised drawings SK-3.
Question No. 6:           In detail SK5, the parapet does not appear to be sealed. Does it have to be sealed? If so, please confirm at what height.
Response:                  For the purposes of this bid, Bidders must consider all existing roof's parapets in the FAA compound to be sealed with Parapro 123 liquid flashing from bottom to top, including the top of parapet. In addition, the existing metal cap flashing must be removed and disposed, and a new stainless steel cap flashing must be installed over all roof parapets.
Question No. 7:           In detail SK6, it shows two steel angles to be removed and replaced, but the note talks about replacing every part that is necessary. For quoting purposes, please confirm if the replacement of only those two angles has to be contemplated, and the other areas with oxidation have to be cleaned according to SP3 and painted.
Response:                  For the purposes of this bid, Bidders must consider in addition to replacing the two identified steel angles in drawing SK-6, to remove oxide in any other steel member by cleaning them according to SP3 power tool method and e finish with oxide primer and two coats of high-performance paint.
Question No. 8:           Is there an electrical supply where the motor of each new window shade is connected?
Response:                  For the purposes of this bid, Bidders must provide electrical facilities to provide power to operate the electric motors for the window shades, including the communication wiring to operate the curtain's control mechanism. For connection to existing electrical facilities refer to the electrical drawings for the original rehabilitation project included with the bid documents.
 
Question No. 9:           For bid item #8 Access Control, are there electrical supplies where the new equipment will be located?
Response:                  For the purposes of this bid, Bidders must provide electrical and video/communication facilities to connect and operate the access control system to the different FAA facilities at the airport, including connections to the electrical system, and necessary communications cabling (voice and data) to operate the access control system. Refer to the electrical drawings for the original air traffic control tower rehabilitation project included with the bid documents.
Question No. 10:         For bid item #10, please provide more details about the Equipment Rack requested.
Response:                  For the purposes of this bid, Bidders must provide any additional new rack as necessary to complete the installation of the new equipment. The existing racks in the control equipment room, in the ATCT level fifth, may be reused if they are suitable for the installation of the new equipment.
Question No. 11:         We need As-Built and Proposed plans for bid item #11 Weather Station, Question No. 5: including location, foundations/bases, and piping/lines.
Response:                  The final location of the “AWOS" system equipment is not currently decided, and the decision depends on the final design for the southern runway expansion. For the purposes of this bid, Bidders must provide and install only the AWOS equipment included in item number 11. Any other necessary works for the installation, such as foundations/bases, electric and communication's connection facilities to the airport and the ATCT, including piping and wiring that needs, will be provided be other. 
Question #12:             We need more details / make and model for bid item #18 light control panel/monitor.
Response:                  For the purposes of this bid, Bidders must provide a new runway light monitor compatible with the existing runway light controllers located in the control room on the first floor of the air traffic control tower. The current supplier of the runway light controller's equipment is Premium Service Inc., Víctor del Pozo (787) 457-5758, vdelpozo@premiumserviceinc.com.
Question No. 13:         For bid item #26 Repair Exterior Cement Plaster, there is no way to know or calculate the amount of linear feet or square feet of each defect to be repaired. For these purposes, we request that a base quantity to be quoted for each defect be indicated; and then adjusted in the field with an additive or deductive change order once the jobs are done and final quantities can be posted.
Response:                  For the purposes of this bid, Bidders must clean all cementitious surfaces by pressure water, in accordance with instructions from the manufacturer of the water pressure equipment, allow the cementitious surfaces to be painted to be completely dry before applying one coat of primer and two coats of paint. Paint to be Emerald Rain Refresh Exterior Acrylic Latex by Shewing-Williams. Paint color to be determined by the Architect.
Question No. 14:         Please confirm if for the bid item 17 Roof Waterproofing, it will be only in the control tower, or also in the bridge and elevator tower?
Response:                  For the purposes of this bid, Bidders must consider in Bid Item 17 the following roofs and parapets: The roof and parapets over the air traffic control cab; the roof and parapets over the elevator tower, the roof and parapets over the bridge between the control tower and the elevator tower; the roof and parapets of the elevator lobby on the ground level; and the roof of the FAA-controlled, emergency generator room on the tower site area. Refer to sheet 621 of 788 in the "Request for Proposal" with the estimated areas of the roofs that are included within this item.
Question No. 15:         There is no way to quantify bid item #28. We suggest setting an allowance for this work.
Response:                  For the purposes of this bid, Bidders must include the task of investigating on the exterior façade of the tower in the surroundings of the closet and its interior the possible cracks through which water could be infiltrating the "closet" of the control panel. elevator electricity. This item shall include, in addition, the cost of chipping the cement plaster for a length of thirty linear feet by a height of 6 inches in the area that is identified as the point of infiltration, repair the crack and plaster with a fine cement mix. the patched area to hide the repair mark, prime and paint the repaired area. Wall surfaces inside the electrical closet should be cleaned and painted with two coats of interior paint.
ADDENDUM NO. 3
TO ALL BIDDERS:
This addendum forms part of the Project Manual for Bid No. 1-34.  Acknowledge receipt of this addendum in the space provided on the bid proposal form.  Failure to do so may subject Bidder to disqualification.
GENERAL Enclosed please find the corresponding evaluations and responses to the RFI No. 1 received last Friday, July 28, 2023, for questions No. 1 to 3.END OF ADDENDUM NO. 3
Below, we include our evaluation and responses to the remaining questions of RFI No. 1 received last Friday, July 28, 2023.
 
Question No. 1:           Please confirm which of the Buy American Act clauses apply to this project (there are Buy American clauses that allow products from countries with trade agreements with the US, and others that do not).
 
Response:                  The Puerto Rico Ports Authority (PRPA) follows the requirements and guidelines established by the Buy American Preference statute.  The Project Manual for Bid 1-34 in Section VI (Bidding Documents) under the Federal Contract Language Certification section, also includes all federal laws and regulations that Bidders must follow.   We include below the actual language used by PRPA in our construction contracts to better clarify the clauses which must be observed:
 
BUY AMERICAN PREFERENCE (Title: 49 USC § 50101)
REQUIREMENTS.
The Buy-American preference requirements established within 49 USC § 50101 require that all steel and manufactured goods used in AIP funded projects are produced in the United States.  It also gives the FAA the ability to issue a waiver to the Puerto Rico Ports Authority to use other materials on the AIP funded project.  The FAA requires that these waivers be requested in advance of use of the materials on the AIP funded project.  The Authority may request that the FAA issue a waiver from the Buy American preference requirements if the FAA finds that:
applying the provision is not in the public interest;  the steel or manufactured goods are not available in sufficient quantity or quality in the United States;the cost of components and subcomponents produced in the United States is more than 60 percent of the total components of a facility or equipment, and final assembly has taken place in the United States.  Items that have an FAA standard specification item number is considered the equipment in this case. For construction of a facility, the application of this subsection is determined after bid opening; orapplying this provision would increase the cost of the overall project by more than 25 percent.  NATIONAL BUY AMERICAN WAIVERS WEBSITE. The FAA Office maintains a list of equipment that has received waivers from the Buy American preference requirements on the http://www.faa.gov/airports/aip/buyamerican/  website.  Products listed on the Nationwide Buy American Waivers Issued list do not require a project specific Buy American preference requirement waiver from the FAA.BUY AMERICAN CERTIFICATIONThe Agreementor agrees to comply with 49 USC § 50101, which provides that Federal funds may not be obligated unless all steel and manufactured goods used in AIP-funded projects are produced in the United States, unless the FAA has issued a waiver for the product; the product is listed as an Excepted Article, Material or Supply in Federal Acquisition Regulation subpart 25.108; or is included in the FAA Nationwide Buy American Waivers Issued list. A bidder or offeror must submit the appropriate Buy America certification (below) with all bids or offers on AIP funded projects. Bids or offers that are not accompanied by a completed Buy America certification must be rejected as nonresponsive.  Type of Certification is based on Type of Project:There are two types of Buy American certifications.  For projects for a facility, the Certificate of Compliance Based on Total Facility (Terminal or Building Project) must be submitted.  For all other projects, the Certificate of Compliance Based on Equipment and Materials Used on the Project (Non-building construction projects such as runway or roadway construction; or equipment acquisition projects) must be submitted.*****
Certificate of Buy American Compliance for Total Facility
(Buildings such as Terminal, SRE, ARFF, etc.)
As a matter of bid responsiveness, the bidder or offeror must complete, sign, date, and submit this certification statement with their proposal.  The bidder or offeror must indicate how they intend to comply with 49 USC § 50101 by selecting one of the following certification statements.  These statements are mutually exclusive.  Bidder must select one or the other (i.e. not both) by inserting a checkmark (ü) or the letter “X".
Bidder or offeror hereby certifies that it will comply with 49 USC. 50101 by: Only installing steel and manufactured products produced in the United States; or  Installing manufactured products for which the FAA has issued a waiver as indicated by inclusion on the current FAA Nationwide Buy American Waivers Issued listing; orInstalling products listed as an Excepted Article, Material or Supply in Federal Acquisition Regulation Subpart 25.108.By selecting this certification statement, the bidder or offeror agrees:To provide to the Owner evidence that documents the source and origin of the steel and manufactured product.  To faithfully comply with providing US domestic productsTo refrain from seeking a waiver request after establishment of the Agreement, unless extenuating circumstances emerge that the FAA determines justified. The bidder or offeror hereby certifies it cannot comply with the 100% Buy American Preferences of 49 USC § 50101(a) but may qualify for either a Type 3 or Type 4 waiver under 49 USC § 50101(b).  By selecting this certification statement, the apparent bidder or offeror with the apparent low bid agrees:To the submit to the Ports Authority within 15 calendar days of the bid opening, a formal waiver request and required documentation that support the type of waiver being requested. That failure to submit the required documentation within the specified timeframe is cause for a non-responsive determination may results in rejection of the proposal.To faithfully comply with providing US domestic products at or above the approved US domestic content percentage as approved by the FAA.To furnish US domestic product for any waiver request that the FAA rejects.To refrain from seeking a waiver request after establishment of the Agreement, unless extenuating circumstances emerge that the FAA determines justified. Required DocumentationType 3 Waiver - The cost of components and subcomponents produced in the United States is more that 60% of the cost of all components and subcomponents of the “facility". The required documentation for a type 3 waiver is:Listing of all manufactured products that are not comprised of 100% US domestic content (Excludes products listed on the FAA Nationwide Buy American Waivers Issued listing and products excluded by Federal Acquisition Regulation Subpart 25.108; products of unknown origin must be considered as non-domestic products in their entirety)Cost of non-domestic components and subcomponents, excluding labor costs associated with final assembly and installation at project location.Percentage of non-domestic component and subcomponent cost as compared to total “facility" component and subcomponent costs, excluding labor costs associated with final assembly and installation at project location.  Type 4 Waiver – Total cost of project using US domestic source product exceeds the total project cost using non-domestic product by 25%. The required documentation for a type 4 of waiver is:Detailed cost information for total project using US domestic productDetailed cost information for total project using non-domestic productFalse Statements:  Per 49 USC § 47126, this certification concerns a matter within the jurisdiction of the Federal Transportation Administration and the making of a false, fictitious or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code.Of the Construction Agreement Date  At the end of the Construction Agreement__
 
____________________________________                                 
Signature
   Company Name Title* * * * *
Question No. 2:           How much time does Puerto Rico Ports Authority estimate will elapse between the bid opening and the bid award?
 
Response:                  The Bid Opening is scheduled for Thursday, August 10, 2023, at 10:30am.  The Bid Award process may take a period of 3-4 weeks for comprehensive evaluation, selection and notification.  Once the selected bidder is notified of the award, an additional 3-4 weeks will be required for contract negotiation and signing.
 
Question No. 3:           Please confirm if ID badge requirements are needed for employees and its cost, if any.
 
Response:                  Yes.  ID badges are required for employees working on the airport premises. Rafael Hernandez International Airport (BQN) has an approved Airport Security Program (ASP) as per Transportation Security Administration (TSA) regulations.  All individuals working in or around the airport premises must carry a Public Airport ID.  The cost per employee for this ID badge is $100.  Additional coordination with Puerto Rico Ports Authority Internal Security Office is necessary after contract signing.


Información de Contacto

Contacto Agencia: ROBERTO RIVERA MEDINA
Teléfono Contacto: 787-729-8715, EXT. 3220
Email Contacto Agencia: Rrivera@prpa.pr.gov
Fecha Publicación:8/3/2023